Cost estimating
Feasibility/Preliminary
Budgetary
Front End Loading (FEED)
AFE
Regulatory and Permits
Preparation of Permit Packages
Submission of Permits
Interfacing with Regulatory Bodies
Project Management
Development of Preliminary Design Concept
Preparation of Project Schedule
Cost Schedule Status Reporting
Work Breakdown Structure
Development of Detail Design
Performing of Process Hazard Analysis (HAZOP)
Interface with Outside Engineering and Construction Contractors
Documentation, Purchasing and Material Expediting
Material Sourcing
Vendor Qualification
Bid Package Preparation
Bid Evaluation and Vendor Recommendation
Purchase Orders
Expediting
QA/QC Procedures and Documentation
Material Management
Invoice Approval
Interface w/ Client Management and Accounting
Pre-commissioning and Commissioning Procedures
Vendor Data Books and Operational Manuals
As-Built Documentation Preparation
Construction Management and Supervision
Preparation of Project Schedule
Cost Schedule Status Reporting
Transportation and Logistics Coordination
Factory Acceptance Testing (FAT) Coordination and Supervision
Site Integration Testing (SIT) Coordination and Supervision
Site Coordination from Initial Construction to Test and Commissioning
Contractor/Owner Conflict Resolution and Mediation
Inspection Services
Client Representation Services
Services Offered
Topsides Offshore Oil and Gas Production Facilities
Onshore Oil and Gas Production Facilities
Platform Jackets and Structural
Reciprocating Gas Compressors
Turbine Driven Gas Compressors
Pipeline Pump Modules
Offshore Pipelines (Shallow and Deepwater)
Onshore Pipelines
Meter Stations
Steel Catenary Risers (SCR’s)
Subsea Completion Tie-backs
Subsea Control Umbilicals
Production Safety Systems and Controls
Subsea Controls
Living Quarters
Generator Modules
Motor Control Centers