Cost estimating

Feasibility/Preliminary

Budgetary

Front End Loading (FEED)

AFE

Regulatory and Permits

Preparation of Permit Packages

Submission of Permits

Interfacing with Regulatory Bodies

Project Management

Development of Preliminary Design Concept

Preparation of Project Schedule

Cost Schedule Status Reporting

Work Breakdown Structure

Development of Detail Design

Performing of Process Hazard Analysis (HAZOP)

Interface with Outside Engineering and Construction Contractors

Documentation, Purchasing and Material Expediting

Material Sourcing

Vendor Qualification

Bid Package Preparation

Bid Evaluation and Vendor Recommendation

Purchase Orders

Expediting

QA/QC Procedures and Documentation

Material Management

Invoice Approval

Interface w/ Client Management and Accounting

Pre-commissioning and Commissioning Procedures

Vendor Data Books and Operational Manuals

As-Built Documentation Preparation

Construction Management and Supervision

Preparation of Project Schedule

Cost Schedule Status Reporting

Transportation and Logistics Coordination

Factory Acceptance Testing (FAT) Coordination and Supervision

Site Integration Testing (SIT) Coordination and Supervision

Site Coordination from Initial Construction to Test and Commissioning

Contractor/Owner Conflict Resolution and Mediation

Inspection Services

Client Representation Services

Services Offered

Topsides Offshore Oil and Gas Production Facilities

Onshore Oil and Gas Production Facilities

Platform Jackets and Structural

Reciprocating Gas Compressors

Turbine Driven Gas Compressors

Pipeline Pump Modules

Offshore Pipelines (Shallow and Deepwater)

Onshore Pipelines

Meter Stations

Steel Catenary Risers (SCR’s)

Subsea Completion Tie-backs

Subsea Control Umbilicals

Production Safety Systems and Controls

Subsea Controls

Living Quarters

Generator Modules

Motor Control Centers