CONSTRUCTION OF LIQUID FUEL SYSTEM (EPC) OF SIRAJGANJ 150 MW PEAKING POWER PLANT
The main objective of the Project is to facilitate dual fuel supply using HSD as an alternate fuel in case of non-availability of natural gas to 150 MW Shirajganj Peaking Power Plant.
The Project, called Liquid Fuel system, will be executed on EPC basis in the vicinity of 150MW Shirajganj Peaking Power plant situated on the west side of Jamuna Multi-Purpose bridge.
The main features of the Project are Design, Supply and Construct/Erect/ Install the following-
HSD Unloading Facility near Bangabandhu West Railway Station for unloading HSD from Railway Wagons.
HSD Transport Pumping Station with 3.2 Km Long Underground Transport Line to Power Plant Area.
2x 5 million capacity HSD Bulk Storage API-650 designed Tanks and 1x 1 million capacity HSD Day API-650 designed Tank.
Transfer Pumping facility to transfer HSD from Storage Tanks to Day tank.
Fire-Water Protection & Fighting System including. Fire & Gas Detection with ESD System.
Plant Control & Supervisory DCS system.
Testing, Pre-Commissioning, Commissioning, start-up and Performance Guarantee Run.
—————————–
Client
NORTH-WEST POWER GENERATION COMPANY LTD

Date
2010-2013