DRILLING OF ONE APPRAISAL CUM DEVELOPMENT OIL/GAS WELL (KTL-7) AT KAILASHTILLA STRUCTURE
The Kailashtilla Gas Field is located in Sylhet district, some 300 km from Dhaka. Between the year 1961 and 2007, six (6) nos. wells, were drilled to meet the increasing gas demand of the country. At present, about 95MMSCFD gas and 1500 barrels of Condensate/NGL are being produced from three gas sands (upper, middle and lower). The main objective of the project is to determine the extent of Kailashtilla structure and to increase the production of gas to meet the growingñup demand of the country.
Under the project, on the basis of result from 3-D seismic survey by BPEPCL (BAPEX) an appraisal cum development oil/gas well, KTL-7 will be vertically drilled at 500 meters away from KTL-4.
—————————–
Client
Sylhet Gas Fields Limited
Date
2013-2014